Engineering

Standards provide guidelines to an asset owner for dealing with condition monitoring of flange connections during the management or operation of the pipeline system. Joint Assembly Records are needed for maintenance, pre-commissioning and commissioning phases. An asset owner specifies to what code the company must qualify. The Joint Assembly Record outlines all of the parameters required to perform the flange connection operation according the specified code.

We offer extensive technical knowledge to develop your Joint Assembly Records because we understand exactly what is needed to engineering durable and reliable flange connections and improve the flange joint integrity.

If you have 10 or 100.000 Flange Joints, we can generate Joint Assembly Records of all your joints. The documentation is done electronically so you can open, adjust and print each record separately for the next use.